Current Planning StatusIn August 2026, the Ministry of Construction was seeking comments on the detailed Phu Bai International Airport plan for 2021–2030 with vision to 2050.2030 ClassProposed ICAO Code 4E.2030 Passenger DemandAbout 4 million passengers/year in the current planning dossier.2030 Cargo DemandAbout 5,000 tonnes/year.2030 RunwayProposed extension of the existing runway to 3,600 m × 45 m.2030 ApronProposed minimum 11 aircraft stands.2030 TerminalContinue T2 operation; reuse T1 infrastructure for general aviation.2050 PassengerProposed 12 million passengers/year.2050 CargoProposed 24,000 tonnes/year.2050 Second RunwayProposed 3,200 m × 45 m parallel runway north of the existing runway.2050 ApronProposed minimum 27 aircraft stands.2050 TerminalProposed T3 east of T2, with T2 + T3 reaching 12 million passengers/year.LandThe planning proposal indicates total airport land of more than 526 ha.Planning RuleUse the August 2026 dossier as the current future-planning reference, but label it proposed/under consultation until approval.