Understand the asset as a connected system of infrastructure, operations and access.
Key things to understand
- Connects Da Nang with the Hue direction through a route west of the coastal Hai Van crossing.
- Only the relevant segment belongs to Da Nang; the corridor is interregional.
- An operating road is not necessarily fully upgraded to final expressway standard.
- Traffic rules and temporary restrictions are more important than a static design-speed headline.