Understand the asset as a connected system of infrastructure, operations and access.
Key things to understand
- The National Highways 14B–14D corridor links Da Nang’s coastal logistics system with the mountainous interior and the Nam Giang international border crossing toward Laos.
- The corridor combines distinct national highways rather than a single numbered road. National Highway 14D connects the Ho Chi Minh Road near Ben Giang with the Nam Giang border area. A 65.37 km upgrade project for Highway 14D began on 26 June 2026, with completion expected in 2028 according to the city portal. The existing road and the improvement works must be distinguished.
- 14B and 14D are different roads connected through the wider inland network; a road-upgrade construction start does not imply the upgrade is complete.
- Confirm temporary closures, access restrictions and current conditions with the road authority before travel.