Understand the industry through structure, geography, operating conditions and opportunity.
Key things to understand
- Hydropower uses the province’s steep terrain and rivers, but electricity generation must coexist with irrigation, drinking water, ecosystems and downstream communities. The provincial plan also identifies biomass and clean-energy development as directions, not installed capacity.
- Water allocation includes electricity generation alongside domestic and productive uses.
- The plan recognizes hydropower alongside agricultural and industrial water needs.
- Biomass is a planning direction; sustainable feedstock availability requires separate assessment.
- Hydropower planning is not proof of an operating plant.